cancel
Showing results for 
Search instead for 
Did you mean: 

Profit Center Hierarchy

Former Member
0 Kudos

I'm setting profit center groups in production and running into a problem.  The standard hierarchy of YBPH doesn't exist when I filter.  I checked the configuration and YBPH is assigned to controlling area A000.  

What am I missing?

Thanks,

Jessica

Accepted Solutions (1)

Accepted Solutions (1)

former_member132345
Contributor
0 Kudos

Hello Former Member,

Regarding the issue, I would like to ask you to check the maintaining of the Profit Center. Please, read the below:

- Follow the SAP KBA: 2697539 - Maintain Profit Center Configuration - Fiori

|- The purpose of this task is to maintain the profit center configuration. The creation of the profit center master data must be executed in the Q-system and P-system. This setup must be completed before posting transactions to the system.

- Besides the KBA, please take a look in the Video which shows How-To (English only) maintain the Profit Center in step by step.

|-https://cdnapisec.kaltura.com/html5/html5lib/v2.73.2/mwEmbedFrame.php/p/1921661/uiconf_id/37285991/entry_id/1_su1nou3w?wid=_1921661&iframeembed=true&playerId=kaltura_player&entry_id=1_su1nou3w

All the best,

Cassiano.

Answers (1)

Answers (1)

Anirban_Dutta
Advisor
Advisor
0 Kudos

Hi Jessica,

Please create Profit center group YBPH and proceed . It should solve the issue.

Regards,

Anirban